Tuesday, September 19, 2017

Revised Lab and lab-techs availability for project work:


Lab and lab-techs availability for project work:



Mon: 1-6th period: piyush; 1-3rd period: lalit
Tue: 1-5th period: piyush; 1-5th period: lalit
Wed: 1-4th period: piyush; 3-4th period: lalit
Thu: 4-5th period: lalit
Fri: 5-6th period: piyush; 4-6th period lalit
Sat: any working saturday whole day


The guidelines remains the same as,


The lab(s) shall be available for doing project work to the students of UG and PG as per the below guidelines,

* The lab needs to be booked by the student prior to working in the lab, may be at least a day in advance
* The lab shall be booked only when the student/ group has the written permission of use of the lab from the supervisor and HOD
* The lab shall be booked for a maximum time of 2 hrs, at a stretch
* The lab shall be booked only if the lab and any lab-tech is free at that time
* Two BTech projects OR 3 MTech students can book the lab simultaneously. More than this shall not be allowed.
* The student shall leave the lab in the same condition as it was before they started working.
* If they leave the lab/ equipment not cleaned, they may not be allowed to book the lab again
* No student shall be using the materials from the lab. They shall be bringing their own materials.
* If they are casting cubes/ cylinders/ slabs etc., the  cube/ cylinders/ slabs etc. should have their name(s) written so that it is not used by others
* The TT when the lab techs are free are (it may change if the TT is again revised),

No comments:

Post a Comment